Recently, many places in Henan have experienced extreme rainfall, causing severe urban flooding, heavy casualties and property losses, and affecting the hearts of hundreds of milli…

Recently, many places in Henan have experienced extreme rainfall, causing severe urban flooding, heavy casualties and property losses, and affecting the hearts of hundreds of millions of people. Currently, Typhoon “Fireworks” has landed in East China. Typhoon and heavy rain warnings have been issued in many places, and the flood prevention situation has been upgraded again. Heavy rain will also have a certain impact on the production and operation of yarn mills. Companies may face water intrusion into equipment, forced shutdowns, delayed delivery, etc.

After heavy rain, machine disposal is very critical. Proper operation can enable the spinning mill to quickly resume production, thereby reducing economic losses. In view of the impact that heavy rain and floods may have on enterprises, Rieter’s after-sales service team gave a recommendation on machine operation measures for reference. Since the on-site conditions of different spinning enterprises are different, the factors affecting the machines are complex and diverse, and enterprises should handle them as appropriate based on the actual situation.

01 If there is water in the distribution room, do not rush to restore equipment operation

Contact the local power supply bureau and arrange for professional technicians to go to the site for maintenance to ensure the safe operation of the equipment.

After draining the water in the power distribution room, sufficient ventilation and dehumidification should be carried out, and the out-of-service equipment such as equipment, cables, and transformers should be checked for flooding.

02 Inspection and treatment of machine electronic and electrical components after wading in water

Thoroughly clean the control panel, Remove the silt, lint and other debris inside the inverter, power supply, various control modules and circuit boards, and then place them in the dryer.

If the motor is exposed to water, you need to open the motor, clean the internal dirt and dry it, and then assemble it. Also make sure the bearings are in good condition and replaced in time. If the customer is using a servo motor and needs to open it, please contact Rieter after-sales service first.

If relays, transformers, switches, solenoid valves and various sensors are exposed to water, they need to be dried and replaced if necessary.

Before powering on the machine, make sure that all parts of the machine are completely dry and in good condition. At the same time, ensure that the control and mechanical moving parts have been thoroughly inspected and cleaned to avoid secondary damage after startup.

03 If the machine is shut down for a long time, you need to pay attention to the following matters when starting it up